Click to go to Vancouver Door Company's Home Page Vancouver Door Company  -  P.O. Box 1418 - Puyallup, WA 98371

Phone:  253.845.9581  Toll:  800.999.3667
Fax: 
253.845.3364   Email:  sales@vancouverdoorco.com


VISION FRAMES

INSTALLATION INSTRUCTIONS
VANCOUVER DOOR WH 20 MINUTE WOOD VISION FRAMES
NEUTRAL PRESSURE

1.  Prior to the installation, position the glazing clips on 1/4" wire glass at 6" maximum from each corner on all the vertical and horizontal edges. Then place additional clips as needed at 12" maximum from each corner clip, a minimum of two clips per side. Position WHI label tag on bottom edge centered.

2.  Set wire glass with clips and label tag applied, in the door cut out and nail with the clips with 1-1/4" common nail on each side of clip, using holes in clip.

3.  Apply Glazing tape or caulking compound approved for fire stopping sealant to the premitered wood moulding.

4.  The wood moulding can now be set in place and nailed with 1-12" finish nails 8" on center, with a minimum of 2 nails per piece.



Positive Pressure 1 | Pos Press 2 | Pos Press 3 | Pos Press 4 | FS821 Kerf Wood | FS820 Kerf Metal
 FS850 Dado Metal | Vision Lites | Vision Frames | Green Issues | Sound Test 1 | Sound Test 2
Sound Test 3 | Zero Systems | 20 & 45 Fire Chart | 60 & 90 Fire Chart | Warranty | Handling


»»  Print Page

» Close Window to Return to Main Site

©  Vancouver Door Company - Click Here to Return to Home Page